Monthly Luncheon @ FAU

Wednesday, April 4, 2018 - 12:00 PM - Wednesday, April 4, 2018 - 05:00 PM

Event Description 

Title: Trenchless Technology for Pipe Replacement 

Number of PDHs requested: 1.0 hour 

Abstract: In efforts to reduce the social, environmental and economic costs of water and sewer  replacement, multiple trenchless methods will be presented including pre‐chlorination, static  pipe bursting, manhole to manhole pipe bursting and Compression Fit HDPE pipe lining.  The technical presentation will focus on the history, design considerations and construction  overview of each trenchless method.   

Live Oak Room A & B.


HDPE and module pipe will also be reviewed in depth including design, Plastic Pipe Institute Calculator, long term performance and connections methods.  Case studies will be presented  from communities in south Florida that have utilized these technologies including a $15M  Design/Build emergency 30‐inch force main replacement project with Fort Lauderdale, pre‐ chlorinated pipe bursting projects with City of Sunrise, Wilton Manors and more.   

Speaker Name: Todd Grafenauer, Vice President/Educational Director, Murphy Pipelines 

 

REGISTER HERE